Jan 302013
 

While residents of the small town of Toton will be welcoming the announcement of a new station with high-speed connections to London, Birmingham, Manchester and Leeds, communities north of the station will be wondering what effect the new High Speed 2 rail line will have on them.

Immediately north of Toton, the M1 will be realigned for a distance of 1700 metres and a 950 metre viaduct constructed over the River Erewash flood plain, the Erewash Canal, Stanton Gate and the Erewash Valley railway line.

HS2
Running mainly parallel to the M1 as the line snakes beyond Toton, the first villages to feel the full force of the HS2 are Strelley and Nuthall. After crossing the A6007 Stapleford road, and the A609 Ilkeston road, south of the M1, the line crosses Trowell Moor. Both of these roads will also be realigned and a 140 metre viaduct will span the A6007 and Erewash Valley line. The A609 will be bridged by the HS2 line south of the M1.

The next village along the line to face upheaval will be Strelley, where a 770 metre ‘cut and cover’ tunnel will be built under Main Street, close to Strelley Hall.

Beyond Strelley, the line will cross the A610 on an 85 metre bridge, again south of the M1, before bridging the B600 Kimberley road next to the M1 in Nuthall. The line will then pass between Hucknall and the M1, bridging the B6009 Hucknall road, before cutting a swathe through High Park Woods, an area that is still recovering from the effects of the recent M1 widening scheme.

HS2 viaduct
After following the M1 to junction 27, the line will cross under the A608 before heading between Selston and Annesley Woodhouse, bridging Salmon Lane in the process. After Salmon Lane, the line will then have to negotiate the remains of the former Bentinck Colliery, which is due to be transformed into a Recreation Park in the near future. This will entail the building of a 100 metre viaduct over Bogs Farm, a site of special scientific interest (SSSI).

The B6018 Kirkby rood will be bridged north of Selston, followed by a 450 metre viaduct spanning the River Erewash flood plain and the Erewash Valley line. The B6019 will be bridged near Langton Hall, with a further bridge over Maghole Brook.

The line then heads north towards Hilcote and Huthwaite, passing immediately behind the East Midlands Designer Outlet. The A38 is passed under shortly after the South Normanton / Hilcote turn offs, before a 50 metre bridge spans the River Amber flood plain, and the line heads off to cut between Tibshelf and Tibshelf Wharf.

Needless to say, there is going to be years of disruption for a substantial area either side of the new line, and compensation payments will be offered to those affected. Not only is the line going to have an effect on house prices, there is also noise and light pollution to take into consideration. Wildlife will be badly affected.

There will be at least three more governments before the line is completed in 2032, and any one of these could pull the plug on the project. Already groups opposed to the line are gaining numbers, and areas like Selston and Nuthall will be quick to join the fight.

Documents:
HS2 initial preferred route plan and profile maps
Route section key plan – Trowell to Killamarsh
Route section plan and profile – Trowell to Bilborough
Route section plan and profile – Bilborough to High Park Wood
Route section plan and profile – High Park Wood to Pinxton
Route section plan and profile – Pinxton to Tibshelf

Websites:
High Speed 2 Limited
Department for Transport

 

  3 Responses to “HS2 – what it means to the neighbourhood”

  1. […] HS2 – what it means to the neighbourhood (alanrowley.info) […]

  2. […] HS2 – what it means to the neighbourhood (alanrowley.info) […]

This site uses Akismet to reduce spam. Learn how your comment data is processed.